• Sales: 866.780.4678
  • Sales Chat
  • Get a Quote
Microsoft Partner of the Year Award
Hosting Solutions - 2010 Finalist
 

Accomplish more … in an instant.

Skip the wait associated with a customized SharePoint solution. AppFoundation™ is the ultimate have-it-all platform…

  • Central Configurations save time and effort
  • Add and edit inside any solution.
  • No sweat branding and navigation.
  • Trigger events, schedule activities and notifiy via alerts.
Browse SharePoint Apps & Features

These apps won't crash your server.

AppFoundation™ is powered by the revolutionary AppEngine.
It's like the 300hp NorthStar V8 to your Cadillac, a never-ending life- source for your SharePoint apps- humming away beneath your hosted SharePoint environment.

Not one core SharePoint DLL is ever touched during installation or configuration, meaning your environment is kept safe from harm.

Learn more about the SharePoint AppEngine

you are here:
Fpweb.net
Sharepoint Apps
Corasworks
App Foundation
 

 

SharePoint AppFoundation™

Dominate productivity with faster deployment

Even the simplest of intranets can take up to 6 months to configure and customize. Not so with SharePoint AppFoundation™. It gives you powerful control over your environment, information and users while generously sparing time and money. Plus, it's incredibly flexible, handling everything from simple plug-and-play apps to the powerful Business Process Module.

You call the shots from one location.

We're introducing a fresh new way to make environment-wide changes.
The revolutionary One-Touch-Management System built into SharePoint AppFoundation™ lets you manage all of your SharePoint apps from a central location.

  • Easily customize SharePoint navigation.
  • Customize displays and views for individuals and groups by role.
  • Simplify controls for permissions and work flow capabilities.

Setting permissions is a cinch

AppFoundation™ eliminates the need to configure each app for every user in favor of a much simpler method. Set the permissions for all your apps in one spot, giving back hours of precious time to your workday.

For Example:

Bob, a business owner, was a regular Salesforce.com user. The task of configuring 5,000 employees and 20 apps was a nightmare. Bob would have to log into each app and change the permissions for all 5,000 employees.

After switching to hosted SharePoint from Fpweb.net with AppFoundation™, he simply sets each user's permissions for all apps in one place - freeing up Bob's IT resources.
 

No tech skills needed.

  • Use built-in tools without deploying code to create solutions within hosted SharePoint
  • Create custom forms, displays, views, reports and more.
  • Configure any app to fit your needs.
 
Any Questions?
Get ’em answered
- or - Sign Up Today
AppFoundation™ for SharePoint Hosting
 
"SharePoint AppFoundation™ gives you immediate access to the tools you need to run your business. In addition, it sets the stage to rapidly add departmental or vertical industry apps to meet your specific needs. Reduce SharePoint dev time. Get to work now with AppFoundation."

-Rob LaMear IV
Fpweb.net Founder & CEO

Unlimited users. No extra cost.

With AppFoundation™, all of the features are provided on an unlimited user basis. There are no per user costs, meaning we won't charge you extra to add 6 users in your office or 6,000 users in Europe.

DLL-free SharePoint Apps

Any SharePoint app installed on AppFoundation™ comes standard with stability and peace of mind. The revolutionary AppEngine protects core SharePoint DLLS, without modifying them in any way.

Sign Up Today

Frequently Asked Questions

Is AppFoundation™ 2010 Ready?
AppFoundation™ is built to operate flawlessly on both WSS v3 and SharePoint 2010 Foundation

What if I already have hosted SharePoint?
AppFoundation™ can be installed by one of many qualified Fpweb.net engineers into your hosted SharePoint plan without any complications.

Besides being DLL-Free, what are some other app benefits?
Each app undergoes strict "Ready-for-Work" testing. All apps are usable out-of-the-box, portable, customizable and easily installed.

 
 
 
close
close
close
close
casino ohne OASIS
casino ohne OASIS
casino ohne OASIS
casino ohne OASIS
casino ohne sperrdatei
casino ohne OASIS
casino zonder cruks